Price of Pre-Engineered Warehouse / Shed in Pakistan – ACCO Engineering Guide 2026
Price of Pre-Engineered Warehouse / Shed in Pakistan – ACCO Engineering Guide 2026
By ACCO Engineering | December 2025
Pre-Engineered Buildings (PEBs) have revolutionized the construction of industrial, commercial, and agricultural warehouses in Pakistan. With faster construction, cost-effectiveness, and high structural durability, PEBs are now the preferred solution for warehouses, logistic hubs, factories, cold storage facilities, and agricultural sheds.
ACCO Engineering is a leading provider of PEB solutions in Pakistan, offering turnkey design, fabrication, and installation services nationwide. This guide provides a detailed insight into the price of pre-engineered warehouse sheds in Pakistan, covering all major cities, technical specifications, sector applications, and cost breakdowns.
1. Introduction to Pre-Engineered Buildings (PEBs)
Pre-Engineered Buildings are modular steel structures designed for quick assembly and high durability. They are factory-fabricated, delivered to the site, and assembled with precision. Unlike RCC structures, PEBs offer flexibility, lower construction time, and reduced waste.
Advantages of PEBs for Warehouses:
Faster construction (45–90 days vs 6–12 months for RCC)
Cost-efficient (PKR 1,000–2,000/sq.ft for standard warehouses)
Modular & flexible for future expansion
Durable and resistant to seismic and wind loads
Energy-efficient when insulated panels are used
2. Key Factors Affecting PEB Warehouse Prices
The cost of a pre-engineered warehouse depends on:
Steel Structure Weight – Heavier steel provides higher durability but increases cost.
Roofing & Wall Cladding – Single-skin sheets are cheaper; insulated sandwich panels are more expensive but energy-efficient.
Building Size & Height – Larger spans and taller sheds require more steel.
Accessories – Mezzanine floors, crane beams, doors, skylights, and ventilation systems add to costs.
Foundation & Civil Works – Soil condition and type of foundation significantly impact overall cost.
Location & Logistics – Transport and erection costs vary by city.
Regulatory Requirements – Seismic, wind, or fire safety standards may increase steel specifications.
3. Nationwide PEB Warehouse Price Overview (2025)
The average cost per sq.ft for a standard warehouse PEB in Pakistan ranges as follows:
| Specification / Warehouse Type | Estimated Cost (PKR/sq.ft) | Notes |
|---|---|---|
| Basic warehouse shed | 500–650 | Minimal structure, basic roof/wall, non-insulated |
| Medium warehouse | 1,250 | Standard steel structure, basic roof/wall cladding |
| Large / heavy-duty warehouse | 1,700–2,300 | Insulated panels, crane provisions, high-strength steel |
Prices include steel structure, wall & roof cladding; civil works (foundation, site prep) are additional.
4. City-Wise PEB Warehouse Prices in Pakistan
Here’s a detailed city-wise price guide for pre-engineered warehouses and sheds:
| City | Avg Price / sq.ft | Demand Notes |
|---|---|---|
| Lahore | 1,000 – 1,300 | Sundar, Raiwind, Shahdara; high demand for logistics & cold storage |
| Karachi | 1,050 – 1,400 | Port warehouses, garment factories, distribution centers |
| Faisalabad | 950 – 1,250 | Textile units, cold storage, medium industrial sheds |
| Islamabad / Rawalpindi | 1,000 – 1,350 | Tech parks, defense, distribution centers |
| Multan | 900 – 1,150 | Agricultural & industrial warehouses |
| Sahiwal | 900 – 1,150 | Poultry, dairy, agro-industrial sheds |
| Peshawar | 950 – 1,150 | Warehouses, agro-processing, logistics |
| Quetta | 1,000 – 1,300 | Industrial and commercial sheds |
| Gujranwala | 950 – 1,200 | Steel, manufacturing, agro-industrial warehouses |
| Sialkot | 1,050 – 1,350 | Sports goods factories, export-oriented warehouses |
| Hyderabad | 1,000 – 1,250 | Industrial & storage facilities |
| Bahawalpur | 900 – 1,100 | Agro-industrial units & warehouses |
| Mardan | 900 – 1,100 | Small industrial sheds |
| Okara | 900 – 1,150 | Poultry & dairy sheds |
| Kasur | 950 – 1,150 | Industrial & storage units |
| Rahim Yar Khan | 900 – 1,100 | Agro-industrial sheds |
| Ferozewala | 950 – 1,200 | Warehouses & factories |
ACCO Engineering offers nationwide installation, ensuring optimized delivery and assembly costs.
5. Sector-Wise Applications of PEB Warehouses
Industrial Sector
Garment factories
Pharmaceutical units
Textile processing plants
Warehousing & Logistics
Distribution centers
E-commerce fulfillment hubs
Import-export terminals
Agriculture & Livestock
Poultry farms
Dairy sheds
Fertilizer storage
Commercial & Retail
Showrooms
Exhibition halls
Parking garages
Example: ACCO Engineering has delivered 20,000 sq.ft cold storage in Lahore, 15,000 sq.ft logistics warehouse in Faisalabad, and 8,000 sq.ft poultry shed in Sahiwal.
6. Detailed Material & Technical Specifications
Primary Frames: I-section or H-beam columns & rafters
Secondary Members: Purlins, girts, bracings (C/Z channels)
Roof Panels: Galvanized steel sheets or insulated sandwich panels
Wall Panels: Color-coated sheets with various thicknesses
Anchor Bolts & Base Plates
Ventilation: Turbo ventilators, ridge vents, louvers
Openings: Rolling shutters, steel doors, skylights
Benefits:
🔩 Strength: Seismic and wind-resistant
🔥 Fire Safety: Fire-resistant coatings
🌧 Weather Resistance: Fully galvanized
🧊 Temperature Control: Thermal insulation panels
♻️ Reusability: Can be relocated or expanded easily
7. PEB Warehouse Cost Breakdown & ROI
Example Formula:
PEB Price = (Steel weight x Rate/kg) + (Roof & Cladding area x Rate/sq.ft) + Accessories
Illustrative Calculation:
Steel weight: 20 kg/sq.ft
Rate: PKR 250/kg
Roofing: 10,000 sq.ft at PKR 150/sq.ft
Total Price: (20 × 250) + 150 = PKR 5,150 / sq.ft
Investment Breakdown (10,000 sq.ft warehouse):
| Expense Item | Estimated Cost (PKR) |
|---|---|
| Civil Foundation | 500 – 700 / sq.ft |
| Steel Structure (PEB) | 900 – 1,200 / sq.ft |
| Insulated Roofing | 200 – 400 / sq.ft |
| Accessories & Fittings | 150 – 300 / sq.ft |
| Total Estimate | 1,750 – 2,600 / sq.ft |
ROI Benefits:
Faster occupancy → earlier revenue
Lower maintenance & utility bills
Typical ROI: 1.5–2.5 years
8. Case Studies: ACCO Engineering PEB Projects
Cold Storage, Lahore: 20,000 sq.ft, completed in 60 days
Logistics Warehouse, Faisalabad: 15,000 sq.ft, cost PKR 18 million
Poultry Shed, Sahiwal: 8,000 sq.ft, insulated panels
Garment Factory, Karachi: 30,000 sq.ft, heavy-duty steel, crane-ready
9. Comparison of PEB vs RCC Warehouses
| Feature | RCC Structure | PEB Warehouse |
|---|---|---|
| Construction Time | 6–12 months | 45–90 days |
| Cost / sq.ft | 2,500 – 3,200 | 1,000 – 2,000 |
| Flexibility | Rigid | Modular & flexible |
| Expansion | Costly | Easy |
| Waste on Site | High | Minimal (factory-built) |
10. Turnkey PEB Solutions by ACCO Engineering
Design → Fabrication → Delivery → Installation → Handover
3D modeling & BOQ analysis for precise quotations
Free site survey & consultation
Nationwide coverage with optimized logistics
ISO-certified fabrication & quality assurance
11. Frequently Asked Questions (FAQ)
Q: What is the cheapest PEB warehouse type?
A: Basic single-skin shed without insulation or accessories.
Q: Can PEBs be used for government tenders?
A: Yes, many government & military departments prefer PEBs for faster delivery.
Q: Can PEB warehouses be exported?
A: Yes, ACCO Engineering exports to Middle East, Africa, and Central Asia.
Q: How long do PEB warehouses last?
A: 25+ years with proper maintenance; steel frames are corrosion-resistant.
Q: Can I expand the warehouse later?
A: Yes, modular PEB design allows easy expansion.
12. Conclusion & Contact ACCO Engineering
PEB warehouses offer a cost-effective, durable, and fast construction solution in Pakistan. ACCO Engineering is your trusted partner for industrial, commercial, and agricultural PEB projects, with nationwide delivery, premium quality, and transparent pricing.
📞 Phone: +92-322-8000190
🌐 Website: www.accoengineering.com
📧 Email: info@acco.com.pk
Related Posts
Post a Comment cancel reply
You must be logged in to post a comment.